Estimate of Trapezoidal Footing Calculator with Column Trapezoidal Footing Material Estimator 1) Number of footing 2) Size of Raft Input value of (a) Inch Feet meter Input value of (b) Feet meter Inch Input value of (c) Feet meter Inch 3) Height of Trapezium Input value of (h) Feet meter Inch ……………………………………………. 4) Size of Column Input value of (d) Inch Feet meter Input value of (e) Inch Feet meter Input value of (f) Feet meter Inch ……………………………………………. 5) Input (Cement:Sand:Aggregate) Ratio: : : 7) Volume of Tipper/Tractor: m³ 8) Conversion Factor: Dry Volume = Wet Volume x Results Wet Volume of Concrete Required: Dry Volume Of Concrete Required : Volume Of Cement Required : Volume Of Sand Required : Volume Of Aggregate Required: Weight Of Cement Required : No. Bags Of Cement Required : No. of Tipper/Tractor: Tip of Sand: Tip of Aggregate: This Calculator calculates the volume of cement, sand, and aggregate, the weight of steel rod according to percentage, Numbers of bags of cement required to construct an RCC Trapezoidal Footing. How to use this tool? Standard Data used in this Calculator Added 54% extra Concrete to convert wet volume into dry volume.Density of cement = 1440 Kg/m3Density of Steel rod = 7850 Kg/m31 Bags of cement = 50 Kg About Footing Estimator The above calculator helps you to calculate the total quantity of material like cement, sand, aggregate, numbers of bags of cement, Weight of steel rods, etc. To calculate cement, sand, aggregate, numbers of bags of cement, Weight of steel rods in concrete, follow the steps below. Put the dimension of trapezoidal footing you want to construct like, length, width, and height as shown in the figure. Put the ratio of cement,sand and aggregate you want to use for concrete. like (1:2:3), (1:1.5:3) etc. Put the percentage (%) of steel rod used in concrete. Normally 2% to 6%.Press Calculate button and Boom.Your result will shown below the calculate button. Share this:FacebookEmailTelegramWhatsApp Related Sharing Is Caring: