Rate Analysis for Brick Work Calculator

This calculator helps you to calculate the Rate Analysis of PCC for RCC works in construction. Fill all red boxes below.

Rate analysis of Brickwork

Rate analysis of Brickwork



Standard Data taken

Weight of 1 bag of cement = 50 Kg.

Required Mason and labor has taken according to I.S Code.

Taken 5% extra Brick for wastage of Bricks.

Taken 34% extra concrete to convert Wet volume into Dry volume of concrete.

By default rate value is given according to construction for Nepal (Terai)

How to use this tool?

Sharing Is Caring: