Rate Analysis of Plaster works Calculator

Rate Analysis of Plaster

Rate Analysis of Plaster

Plaster Works Estimation & Costing

Rate analysis of Plaster Works
:
:
(By IS Code)

Rate Analysis Table

S.N. Particular Description Unit Quantity Rate/day/No. (Rs) Amount (Rs)
1 Manpower No. of Mason required Nos. 0.00 0.00
No. of Labour required Nos. 0.00 0.00
2 Materials Dry Volume of Mortar m³ 0.00 – –
Bags of Cement Nos. 0.00 0.00
Volume of Sand m³ 0.00 0.00
Water Required Liters 0.00 0.00
Sub-Total: 0.00
Overhead and Profit % 0.00
Total Cost: 0.00
Rate/m² Plaster 0.00

Standard Data taken

This calculator helps you to calculate the Rate Analysis of Plaster works in construction. Fill all red boxes below.

Weight of 1 bag of cement = 50 Kg.

Required Mason and labor has taken according to I.S Code.

Taken 34% extra mortar to convert Wet volume into Dry volume of concrete.

By default rate value is given according to construction for Nepal (Terai)

How to use this tool?

  • Inter all the values in the box above are written in red color.
  • Fill in the rates according to your area.
  • Add % of profit to contractors.
  • Enter calculate button to get all the quantity and amount with the rate per meter square of the plaster.