This calculator helps you to calculate the Rate Analysis of PCC for RCC works in construction. Fill all red boxes below.
Rate Analysis of PCC for RCC
Plain Cement Concrete (PCC) for RCC Works Estimation
:
:
(By IS Code)
(By IS Code)
Rate Analysis Table
| S.N. | Particular | Description | Unit | Quantity | Rate/day/No. (Rs) | Amount (Rs) |
|---|---|---|---|---|---|---|
| 1 | Manpower | No. of Mason required | Nos. | 0.00 | 0.00 | |
| No. of Labour required | Nos. | 0.00 | 0.00 | |||
| 2 | Materials | Dry Volume of Concrete | m³ | 0.00 | – | – |
| Bags of Cement | Nos. | 0.00 | 0.00 | |||
| Volume of Sand | m³ | 0.00 | 0.00 | |||
| Volume of Aggregate | m³ | 0.00 | 0.00 | |||
| Water Required | Liters | 0.00 | 0.00 | |||
| Sub-Total: | 0.00 | |||||
| Overhead and Profit | % | 0.00 | ||||
| Total Cost: | 0.00 | |||||
| Rate/m³ PCC for RCC | 0.00 | |||||
Standard Data taken
Weight of 1 bag of cement = 50 Kg.
Required Mason and labor has taken according to I.S Code.
Take 54% extra concrete to convert Wet volume into Dry volume of concrete.
By default rate value is given according to construction for Nepal (Terai)
How to use this tool?
Video coming soon..,