Civil Engineering Quiz

Topper Student Name will publish on Telegram

0%
0 votes, 0 avg
10

The Time of the Quiz will be 5 minute only

You have completed the quiz in 5 minutes


Construction Materials Quiz

1 / 10

1)

The initial setting time of lime-pozzolana, is

2 / 10

2) The variety of pig iron used for the manufacture of steel by Bessemer process, is

3 / 10

3)

In a mortar, the binding material is

4 / 10

4) Due to attack of dry rot, the timber

5 / 10

5) Quartzite is a

6 / 10

6) The rocks formed by gradual deposition, are called

7 / 10

7) Sand stone is

8 / 10

8) Initial setting time of cement for asbestos cement products should be not less than

9 / 10

9)

Ultimate strength to cement is provided by

10 / 10

10) Good quality stones must

Your score is

0%

error: Content is protected !!